中文版     ENGLISH 
    News
    Contact UsMore>>
    Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
    Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
    Tel:86-0755-26788241
    Fax:86-0755-26788245
    Industry NewsNews > Industry News > DIP plug-in considerations    

    DIP plug-in considerations

    Hits:1  Add Date:2020/3/24

    DIPplug-in post-welding processing is a process after SMT chip processing, and theprocessing process precautions are as follows:

     

    1.Pre-processing of components

    Thestaff of the pre-processing workshop picks up the materials from the BOMaccording to the BOM bill of materials, carefully checks the material model andspecifications, signs, and performs pre-processing according to the model(using automatic bulk capacitor shears, transistor automatic molding machine,fully automatic belt type Processing equipment such as molding machines).

    Claim:

    The horizontal width of the adjusted component pin needs to be thesame as the width of the *** hole, and the tolerance is less than 5%;

    The distance between the component pins and the PCB pads should notbe too large;

    If the customer requests, the part needs to be formed to providemechanical support and prevent the pad from lifting.

     

    2.Paste high-temperature adhesive tape, enter the board paste high-temperatureadhesive tape, and block the tin-plated through holes and components that mustbe soldered later;

     

    3.DIP plug-in processing workers need to bring electrostatic rings, wearanti-static clothes and hats to prevent static electricity, and perform plug-inaccording to the component BOM list and component bit number diagram. Care mustbe taken when inserting the plug-in.

     

    4.For the inserted components, check them, mainly check whether the componentsare inserted incorrectly or missed;

     

    5.For the PCB board with no problems with the plug-in, the next step is wavesoldering. The wave soldering machine performs automatic soldering processing,which is a firm component.

     

    6.Remove the high-temperature adhesive tape, and then check. In this step, themain inspection is to visually observe whether the soldered PCB board is weldedintact;

     

    7.Repair and repair the PCBs that are found to be incompletely welded to preventproblems;

     

    8.Post-welding, which is a process set for components with special requirements,because some components cannot be directly welded by wave soldering machinesaccording to the process and material limitations, and need to be completedmanually;

     

    9.After all components are soldered to the PCB board, a functional test isperformed to test whether each function is normal. If a functional defect isdetected, repair and test processing is required.

    PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
    Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
    主站蜘蛛池模板: 男女一边摸一边爽爽视频| 两个人的视频www免费| 性欧美激情videos| 欧美xxxx性猛交bbbb| 国产精品毛片va一区二区三区| 亚洲精品无码久久| 99er在线视频| 欧美精品第一页| 国产精品综合色区在线观看| 亚洲成a人片在线观看精品| 182tv午夜精品视频在线播放| 欧美性猛交xxx猛交| 国产精品JIZZ在线观看无码| 亚洲av永久无码精品网站 | 日本三级韩国三级欧美三级| 欧洲吸奶大片在线看| 国产探花在线精品一区二区| 久久精品2020| 色五月在线视频| 性欧美成人免费观看视| 免费人成在线观看视频高潮 | 国产免费私拍一区二区三区| 久久午夜无码鲁丝片| 色偷偷偷久久伊人大杳蕉| 情欲小说app下载| 人妻精品久久久久中文字幕| 97免费人妻无码视频| 欧美77777| 国产伦精品一区二区三区| 中国china体内裑精亚洲日本| 男人j进美女p动态图片| 国产精欧美一区二区三区| 九九影视理伦片| 色噜噜的亚洲男人的天堂| 嫩草影院在线入口| 亚洲男女一区二区三区| 久久五月激情婷婷日韩| 无码中文资源在线播放| 日产乱码卡1卡2卡三免费| 啊灬啊灬啊灬喷出来了| jizzjizzjizz国产|